Posts
- Stiver Sponsors 2025 Underground Infrastructure Conference (January 8, 2025)
- Texas Water 2025 (January 8, 2025)
- 2025 NASTT No Dig Show (January 8, 2025)
- Stiver Engineering Attends CUIIC Advanced HDD School (January 7, 2025)
- Microtunneling Short Course (January 7, 2025)
- Rapid Excavation and Tunneling Conference (RETC) 2025 (January 7, 2025)
- 2025 Grouting Short Course (January 6, 2025)
- Beaverdilly 2025 (January 6, 2025)
- Trenchless Technology Project of the Year: Canada’s Trans Mountain Expansion (October 18, 2024)
- Q2 2024 Quarterly Newsletter (August 5, 2024)
- Artificial Intelligence Could Revolutionize Tunnel Design (July 13, 2024)
- Tunneling on the Moon? (June 13, 2024)
- Breakthrough in Tunneling Short Course (April 29, 2024)
- Tunneling Fundamentals, Practice and Innovations (April 29, 2024)
- Q1 2024 Quarterly Newsletter (March 18, 2024)
- 2025 NASTT No Dig North Show – Canada (March 7, 2024)
- Expert Tunneling, Shoring, and Construction Engineering from Stiver Engineering (March 6, 2024)
- 2025 UCA Cutting Edge Conference (January 4, 2024)
- Q4 2023 Quarterly Newsletter (December 14, 2023)
- South Ruckle Dike and Drainage System Detailed Design (November 29, 2023)
- North Harris County Regional Water Authority Project 28G wins Project of the Year Award for Environmental Projects (November 9, 2023)
- Q3 2023 Quarterly Newsletter (October 16, 2023)
- Houston Public Works water line project receives Project of the Year award from TX-APWA (September 11, 2023)
- Our Core Values at Stiver Engineering (August 3, 2023)
- Construction and Structural Engineering Emergency Services from Stiver Engineering (July 10, 2023)
- Remembering Maury Stiver (May 8, 2023)
- Q2 2023 Quarterly Newsletter (April 27, 2023)
- Stiver Engineering Expands to Canada (March 7, 2023)
- Q1 2023 Quarterly Newsletter (February 16, 2023)
- Potable Water Challenges Across the Country (January 11, 2023)
- Q4 2022 Quarterly Newsletter (November 21, 2022)
- Stiver Engineering Quarterly Newsletter: Stiver Solutions (July 19, 2022)
- Q3 2022 Quarterly Newsletter (July 19, 2022)
- Tunnel Business Magazine: Project Updates (July 15, 2022)
- Stiver’s Tunneling Projects in Toronto and Texas Featured in Tunnel Business Magazine (June 26, 2022)
- Q2 2022 Quarterly Newsletter (April 21, 2022)
- Stiver Engineering Quarterly Newsletter: Stiver Solutions – Second Edition (April 20, 2022)
- Stiver Engineering Helps Complete a Challenging Tunneling Project in Downtown Houston (March 7, 2022)
- Stiver Engineering Launches Quarterly Newsletter: Stiver Solutions (February 2, 2022)
- Q1 2022 Quarterly Newsletter (January 27, 2022)
- Stiver Engineering’s Shoring Design Services Propel Massive Water Transmission Line Project in Houston Area (October 15, 2021)
- Stiver Engineering Projects Lauded in Tunnel Business Magazine, Including Cover Story (June 21, 2021)
- Stiver Engineering Helps Push Needed Texas Infrastructure Improvements Forward (June 21, 2021)
- Stiver Engineering Provides Critical Services for Transformative Waterloo Greenway Project (June 21, 2021)
- Latest ASCE Report Highlights Ongoing Need for Proactive Engineering (March 3, 2021)
- Tunnel Business Magazine’s 2021 Outlook Issue Highlights 8 Stiver Engineering Projects (February 24, 2021)
- Stiver Engineering Supports San Antonio’s Historic Sanitary Sewer Improvement Project (January 28, 2021)
- Stiver Engineering’s Work Featured in Tunnel Business Magazine’s Major Projects List (November 4, 2020)
Pages
- No Dig North Happy Hour (October 5, 2024)
- WP 2FA User Profile (September 30, 2024)
- Cemetery Brook Drain Tunnel (September 7, 2024)
- ALCOSAN Tunnel Project (September 7, 2024)
- CapEX Drainage Project (March 7, 2024)
- Open Bids and RFPs (October 13, 2023)
- Thank you (May 17, 2023)
- Privacy Policy (February 23, 2023)
- Sitemap (August 5, 2022)
- Mailing List (June 28, 2022)
- Account (June 10, 2022)
- Login (June 10, 2022)
- Client Files (June 10, 2022)
- Industries (May 26, 2022)
- Government – Defense (May 26, 2022)
- Public & Civil Infrastructure (May 26, 2022)
- Design Engineer Commercial and Industrial Land Development (May 26, 2022)
- Contact Stiver Engineering Design Firm (May 10, 2022)
- News (May 10, 2022)
- Projects (May 10, 2022)
- Design Engineer Services (May 3, 2022)
- Kensico Eastview Connection (September 7, 2024)
- Cleveland – NEORSD Project Clean Lake (September 7, 2024)
- Shoring Design (February 12, 2024)
- Wastewater System Design (February 12, 2024)
- Tunnel Design (January 25, 2024)
- Water Engineering Design: Innovative Solutions for Water Lines and Treatment Plants (May 25, 2022)
- Land Development (May 25, 2022)
- Construction Engineering Design (May 25, 2022)
- Shaft Design (May 25, 2022)
- Dewatering System Design (May 25, 2022)
- Structural Design Services (May 19, 2022)
- About Civil Engineering Company (May 3, 2022)
- Home (May 2, 2022)
- Password Reset (November 25, 2019)
- Logout (November 25, 2019)
- User (November 25, 2019)
Projects
- Quitman 78 Inch Emergency Project (July 11, 2024)
- Brushy Creek Regional Utility Authority Raw Water Delivery System (March 2, 2024)
- Romeo Arm Interceptor Segment 5 Lining (October 13, 2023)
- North Harris County Regional Water Authority Project 28G proposed 84-inch Water Line Along Gessner Road From SH 249 Regional Pump Station to Greens Bayou (October 13, 2023)
- North Clarksville Water Treatment Plant (September 6, 2023)
- Houston Public Works Surface Water Transmission Program 72-inch Water Line from Emancipation to Tuam (August 25, 2023)
- Broadway Corridor Project (June 15, 2023)
- Sims Bayou Microtunneling Project (March 7, 2023)
- Memorial Park Ravine Bridges (June 29, 2022)
- Ashburton Tanks Project (June 22, 2022)
- COH Hedrick Force Main Crossing Replacement— 42” Horizontal Directional Drill Under Buffalo Bayou (March 15, 2022)
- Plum Creek HDD Project (March 1, 2022)
- Ashbridge Bay Treatment Plant Outfall (January 24, 2022)
- Paradise Whitney Interceptor (January 24, 2022)
- Stiles Slipline Project Near North 2nd Street and Stiles Drive (January 22, 2022)
- Northgate Regional Lift Station Caisson Design (December 22, 2021)
- Esplanade Boulevard 108-Inch Waterline Project (December 7, 2021)
- 72-Inch Water Line Shoring Design (November 2, 2021)
- Northeast Transmission Line Shoring Design (October 15, 2021)
- HEB Process Water Treatment Facility (September 16, 2021)
- Baytown-Houston Ship Channel Crossings-Crane Load Analysis (September 1, 2021)
- West Harris County Regional Water Authority Surface Water Supply Project (September 1, 2021)
- TRA CRWS Phase III-B Solids Management Improvements (August 11, 2021)
- Bulkhead Replacement at Ballentine Street (August 11, 2021)
- Intercontinental Park Water Line Launch Shaft and Thrust Block Design (June 21, 2021)
- Big Wave Project Sheet Pile Shoring (May 11, 2021)
- Houston Water Line Capital Project (May 11, 2021)
- Northeast Water Purification Plant Expansion Pulley System (May 7, 2021)
- Joes Creek Interceptor Improvement Project (May 7, 2021)
- Athens Integrated Pipeline Project (May 3, 2021)
- Schoharie Reservoir Low Level Outlet Microtunnel (May 3, 2021)
- Chelford City Diversion Package Concrete Vault Design (April 16, 2021)
- 48-inch Diameter Waterline Tunnel and Thrust Block Project from W. Bellfort Ave. to Bissonnet St. along Braes Forest Dr. (April 16, 2021)
- Construction Yard Land Development (April 16, 2021)
- Brazos Street Bridge Demolition and Jacking (April 16, 2021)
- Conroe Central Wastewater Treatment Plant Lift Station Design (April 16, 2021)
- Mill Creek Wastewater Treatment Plant Pipe Rehabilitation Design (April 16, 2021)
- North Hays Wastewater Treatment Plant Expansion (April 16, 2021)
- Charlie’s Pasture Pier Designs (April 16, 2021)
- Eastern New Mexico Rural Water System Project (April 16, 2021)
- Charlotte Airport Shoring Project (April 16, 2021)
- Parmer Lane Wastewater Tunnel Interceptor (April 16, 2021)
- Redmond Wastewater Lift Station Caisson Design (April 16, 2021)
- Waco Street Bridge Demolition (April 16, 2021)
- Northeast Water Purification Plant Expansion Shoring Design (April 16, 2021)
- Highway 105 River Bridge Cofferdams (April 16, 2021)
- Fort Bend County Pump Station Shoring (April 16, 2021)
- San Antonio Water System W-6 Upper Segment Main Project (April 1, 2021)
- 108-inch Waterline EPBM Tunnel Project Beneath US59 – Smith to Lee Segment (April 1, 2021)
- Mason Park Bridge Projects (April 1, 2021)
- Houston Water Line Support System Design (April 1, 2021)
- Houston Water Control and Improvement District Sinkhole (April 1, 2021)
- Myrtle Morehead Drainage Improvements (April 1, 2021)
- Hempstead Road Railroad Overpass Shoring Design (March 31, 2021)
- Bois D’Arc East Fork Trinity River Tunnel (March 5, 2021)
- Lackland Air Force Base – Military Working Dog Kennels Design/Build (September 28, 2020)
- Randolph Air Force Base – Fire Station Building Design (Building 749) (September 18, 2020)
- Forth Worth Integrated Pipeline (IPL) Project – Section 17 Trinity River Tunnel (July 31, 2020)
- Mill Creek Drainage Relief Tunnel Project Dallas, TX, (March 8, 2019)
- TxDOT BS 71-F Bridge over Colorado River (March 3, 2019)
- SH 288 Reconstruction Project – Southmore Bridge Demolition (January 25, 2019)
- Northeast Water Purification Plant Expansion Project (January 6, 2019)
- Emmons Car Dealership (January 6, 2019)
- Bergamos Spa Retreat (January 6, 2019)
- Druid Lake Excavation & Shoring Project (January 16, 2018)
- Lake Hartwell Water Treatment Plant – Raw Water Pump Station (August 30, 2017)
- Luce Bayou Interbasin Transfer Project – Capers Ridge Pump Station (November 25, 2016)
- Lane City Reservoir Project (November 25, 2016)
- Indianapolis Deep Rock Tunnel Connector Pump Station (November 25, 2016)
- Seeling Channel Construction (September 29, 2016)
- Rivanna Pump Station (June 23, 2016)
- Yale Street Bridge Demolition (June 16, 2016)
- Hydrotest Machine Foundation and Building (February 1, 2016)
- Hardy Yards Retaining Wall (February 1, 2016)
- 1,500 Ton Carousel Foundation Design (February 1, 2016)
- Harris County Flood Control District – Channel Conveyance Improvements (February 1, 2016)
- New York Environmental Protection Bureau of Engineering Design & Construction (January 28, 2016)
- Harris County ID #18 – 1.154 M.G. Water Storage Tank (January 28, 2016)
- Harris County Toll Road Authority – Grand Parkway – Segment E (January 28, 2016)
- Zapata Wastewater Treatment Facility (January 28, 2016)
- Parkway Wastewater Treatment Facility (January 28, 2016)
- Nassau Bay Wastewater Treatment Facility (January 28, 2016)
- Blackhawk Regional Wastewater Treatment Facility (January 28, 2016)
- West Ashley Sewer Tunnel and Influent Pump Station (January 28, 2016)
- TECO Central Plant Electrical Distribution Duct Bank (January 28, 2016)
- Trench Safety & Bore Pit/Access Shaft Plans (January 28, 2016)
- Excavation Plans (January 28, 2016)
- Waller Creek – Waterloo Park Project (January 28, 2016)
- Texas Tech University – Memorial Circle Tunnel Replacement (January 28, 2016)
- CenterPoint IH-10 Utility Relocation Project (January 28, 2016)
- TxDOT – Patterson Street Pump Station (January 28, 2016)
- Scott Street Pump Station Shoring Project (January 28, 2016)
- Liner Plate Shaft Design, Ring Beam and Timber Lagging Shaft Design (January 28, 2016)
- SAWS Medio Creek Project (January 28, 2016)
- Houston Rapid Transit – Pit “E” – Valve Vault Construction Project (January 28, 2016)
- UTMB Infrastructure – Ike Recovery Project (January 28, 2016)
- Heritage Plaza Pedestrian Tunnel Project (January 28, 2016)
- North Side Sewer Relief Tunnel Siphon (January 28, 2016)
- Liberty County Stormwater Pump Station Rehabilitation Project (January 28, 2016)
- Liberty County Pump Station WCID #5 (January 28, 2016)
- Downtown Drainage Improvements – Kinney Street Stormwater Pump Station (January 28, 2016)
- Western Canyon Regional Water Supply Project-Raw Water Intake & Pump Station (January 28, 2016)
- Bush Intercontinental Airport Pump Station (January 28, 2016)
- The Boardwalk Trail at Lady Bird Lake (January 28, 2016)
- Precast Building Design (January 28, 2016)
- Centerpoint Electrical Precast Junction Boxes (January 28, 2016)
- Marine Rail and Barge Lifting System Design (January 28, 2016)
- Manufacturing Facility – Press Foundation Houston (January 28, 2016)
- Crosby Dayton Road Building Foundation Design Project (January 28, 2016)
- Texas City Caisson Pump Station (January 28, 2016)
- Keegans Bayou Pump Station (January 28, 2016)
- Rathbun Regional Water Association – Intake Structure (January 28, 2016)
- Private Product Testing Facility (January 28, 2016)
- Harbor Wastewater Replacement Tunnel for the City of Charleston (January 28, 2016)
- Private Subsea Product Testing Facility (January 28, 2016)
- City of Baton Rouge – Industriplex Area Wastewater Facility Upgrades (January 28, 2016)
- Temporary Construction Bridge at Oyster Creek (January 28, 2016)
- Hufsmith Kohrville Road Land Development Project (January 28, 2016)
- Crosby Dayton Road Land Development Project (January 28, 2016)
- Santa Fe Road Land Development Project (January 28, 2016)
- Detention, Floodplain Mitigation, & Fire Storage Pond Design and Inspection Projects (January 28, 2016)
- McGowen Street Utility Connection Project (January 28, 2016)
- Caroline Street Land Development Project (January 28, 2016)
- Commercial and Industrial Driveway Widening Project (January 28, 2016)
Bids
- FM2920 Lift Station Consolidation Phase 1 – 30” Sanitary Sewer (December 12, 2024)
- Blanco Rd. to Orsinger Ln. Pressure Zone 1111 24-Inch Water Main Project (December 12, 2024)
- Professional Engineering Services – Wastewater Treatment Construction Project (December 12, 2024)
- Qualifying Tunneling Contractors Services – Fort Garry-St. Vital Siphons Construction & Replacement (December 12, 2024)
- Engineering Services for Creek Road Wastewater Pump Station Resiliency Project (December 12, 2024)
- University Ground Storage Tank No. 1 Replacement Project (September 12, 2024)
- City of Pflugerville Wilbarger Wastewater Interceptor (September 12, 2024)
- Ft. Bend Co. Stella Road Water & Sanitary Sewer Extension (September 12, 2024)
- Carrier Parkway Wastewater & Median Improvements: Dickey Road to Cherokee Trace (September 12, 2024)
- BCMUD No. 57, Lift Station No. 2 (September 12, 2024)
- Ohuta Park Retaining Wall (September 12, 2024)
- Wastewater Lift Station Design Rehabilitation Project (September 12, 2024)
- Craig Road Pedestrian Bridge Construction (September 12, 2024)
- Water System Capital Improvement Plan – Phase 3 (September 5, 2024)
- Brigeland Development LP Upper Langham Creek Phase 3 Channel and Detention Basin Design (September 5, 2024)
- New Water Treatment Facility Construction Project (September 5, 2024)
- #2455-B Starrs Mill School Tunnel Construction (September 5, 2024)
- LS-1 Boat Harbor Pump Station (September 5, 2024)
- 101/202 Redundant 66-Inch Sewer Line Project (August 29, 2024)
- Engineering Services for Fallkill Trunk Sewer Rehabilitation (August 29, 2024)
- Observatory Water Treatment Plant 36-Inch Raw Water Main & Ragged Mountain Raw Water Pump Station (August 29, 2024)
- Sewer Pump Station 28 Rehabilitation (August 29, 2024)
- McBride Drain Pedestrian Bridge (August 29, 2024)
- Design & Engineering Services for the Nicola River Water Main Crossing Project (August 29, 2024)
- Wastewater Collection Phase One, Contract No. 4 (August 29, 2024)
- Pritchard Water Treatment Plant (August 29, 2024)
- Retaining Wall Kces (August 29, 2024)
- Riverwalk Retaining Wall Replacement Project (August 29, 2024)
- Replacement of the Theodore Fremd Retaining Wall (August 29, 2024)
- Mount Morris Dam Bulkhead (August 29, 2024)
- DESIGN-BID-BUILD, DRY DOCK 3 MODERNIZATION (August 8, 2024)
- League City – East Main 24" Force Main Replacement Project (August 8, 2024)
- Texas Highway 365 Force Main and Lift Station Improvements (August 8, 2024)
- Batesville WTP Improvements (August 8, 2024)
- Interim Wastewater Treatment Plant Expansion No. 3 From 0.50 MGD to 0.75 MGD within Fort Bend County M.U.D. No. 5 & No. 157 (August 8, 2024)
- HCMUD No. 418 Wastewater Treatment Plant No. 1 Expansion to 3 MGD (August 8, 2024)
- Union Mine Wastewater Treatment Facility Headworks Construction Project (August 8, 2024)
- Bender Beach Concrete Retaining Wall Project (August 8, 2024)
- Replace Sanitary Sewer Lines at Pier 12 and 14 (August 8, 2024)
- Southern Pines Sewer Rehabilitation and Replacement (August 8, 2024)
- 18th Street Pump Station Rehabilitation Design (August 8, 2024)
- West Bulkhead Replacement at the Cape Cod Canal East Boat Basin (August 8, 2024)
- Pedestrian Bridge Relocation Project (August 8, 2024)
- N. New Braunfels Phase 2 (E. Houston – Paso Hondo) (August 1, 2024)
- Seguin Cedar Street Water Line / SH 46 Water Line Expansion Project (August 1, 2024)
- Candela Sections 15, 18 & Candela Lift Station (August 1, 2024)
- Camp Swift Estates Approach Main and Pump Station (August 1, 2024)
- East Lift Station Expansion- Phase 1- Lift Station Construction (August 1, 2024)
- HPW- Wastewater Collection System Rehabilitation and Renewal (August 1, 2024)
- Proposed Transmission of Zone B Sanitary Sewer Flows to Zone D Wastewater Treatment Facility (August 1, 2024)
- WASTEWATER COLLECTION SYSTEM IMPROVEMENTS (August 1, 2024)
- SOQ Tropical Farms Water Treatment Plant Expansion (August 1, 2024)
- NTUA Shiprock Wastewater Treatment Plant (August 1, 2024)
- Wastewater Treatment System Installation, Harry S. Truman Lake (August 1, 2024)
- Columbia Street Steam Tunnel Replacement (August 1, 2024)
- Covington Sanitary Sewer Rehab/ Replacement (August 1, 2024)
- Summersville Lake Battle Run Lift Station Submersible Grinder Pumps (August 1, 2024)
- RFQ Prequalification Invitation for Sewer Lift Station No. 3 (August 1, 2024)
- Ringgold Rail Trail Pedestrian Bridge Construction (August 1, 2024)
- Red Deer Old CPR Pedestrian Bridge (August 1, 2024)
- U.S. Route 11 Retaining Wall Project (July 29, 2024)
- Fairfax Bolinas Road MP 1.00 Retaining Wall & Existing Wall Repair (July 29, 2024)
- Walnut Street Pedestrian Bridge Repair & Rehabilitation (July 29, 2024)
- UBC Botanical Garden Pedestrian Bridge Replacement (July 29, 2024)
- RCH Take Point & Pump Station – 3MG Tank (July 29, 2024)
- City of Josephine – North Wastewater Treatment Plant (July 29, 2024)
- Lift Station No. 3 (July 29, 2024)
- Seguin Cedar Street Water Line Expansion Project (July 18, 2024)
- Navassa Wastewater Collection System Rehabilitation Project (July 18, 2024)
- NE Portland Urgent Sewer Rehabilitation Project (July 18, 2024)
- Crichton Sanitary Sewer Rehabilitation Project (July 18, 2024)
- Quinwood Sanitary Sewer Rehabilitation (July 18, 2024)
- Marfrance Sanitary Sewer Rehabilitation (July 18, 2024)
- Construction of Sanitary Sewer Rehabilitation (July 18, 2024)
- Elliott Street Bridge Retaining Walls (July 18, 2024)
- Tulameen Ave Retaining Wall (July 18, 2024)
- Ruthven Street Retaining Wall Construction (July 18, 2024)
- CIDH Retaining Wall Construction Project (July 18, 2024)
- Hardwick Farms Road Spanning Porter Brook – New Bridge/Culvert Structure Construction (July 18, 2024)
- NE Portland Urgent Sewer Rehabilitation Project (July 18, 2024)
- 2024 Sewer System Rehabilitation Project (July 18, 2024)
- J. Hood Wright Park Retaining Wall and Pedestrian Ramp Reconstruction (July 18, 2024)
- Fairfax Bolinas Road MP 1.00 Retaining Wall & Existing Wall Repair (July 18, 2024)
- Nile Creek Pedestrian Bridge Construction (July 18, 2024)
- Pedestrian Bridge Relocation Project (July 18, 2024)
- Michael J. Tighe Park Trail and Pedestrian Bridge (July 18, 2024)
- San Antonio Fire Department Emergency Generator Project (July 9, 2024)
- City of Tyler – Southside Wastewater Treatment Plant Improvements (24-021) (July 9, 2024)
- NTMWD – Preston Road Lift Station Expansion (July 9, 2024)
- New Loxley Water Treatment Plant (July 9, 2024)
- 2024 Sanitary Sewer Rehabilitation (July 9, 2024)
- 146 Seventh Street Retaining Wall Construction (July 9, 2024)
- HMA-G, HMA (Type A), Cold Plane AC, & Soldier Pile Retaining Wal (July 9, 2024)
- I-490 Railroad Track Relocation and Retaining Wall (July 9, 2024)
- Port St. Joe Sewer Collection Transmission System Rehab Phase 2 (July 8, 2024)
- Hardwick Pedestrian Bridge Construction Project (July 8, 2024)
- MLK Bridge Rehabilitation (July 8, 2024)
- Carson City Quill Water Treatment Plant Rehabilitation Project (June 12, 2024)
- Retaining Wall Reconstruction at Quarter Town Line (June 12, 2024)
- Prospect Heights Retaining Wall (June 12, 2024)
- N. Nelson Water District New Hwy 245 Booster Pump Station (June 12, 2024)
- Lift Station and Force Main to serve Northpark South within Montgomery County M.U.D. No. 96 (May 23, 2024)
- SSSD Wastewater Treatment Plant Improvements Project (May 23, 2024)
- Barton/Bandemer Park Pedestrian Tunnel Project (May 23, 2024)
- Preliminary Engineering Design Services for Relocation of Shipping Street Pump Station and Related Sewer Mains (May 23, 2024)
- Shenandoah, IA – 2023 Wastewater Treatment Facility Improvements (May 14, 2024)
- TND0020098, BRIDGERAIL REHABILITATION, CONCRETE REPAIRS, HEAVY ROCK RIPRAP INSTALLATION, DEMOLISH EXISTING BRIDGE STRUCTURE AND OTHER WORK (May 14, 2024)
- Center Point Wastewater Improvements – Phase 2 (May 7, 2024)
- Brock ISD Wastewater Treatment Plant Replacement (May 7, 2024)
- Detention Basin and Storm Sewer to serve Ranch Country within Northwest Freeway Municipal Utility District (May 7, 2024)
- ICES Tunnel Repair and Renewal (May 7, 2024)
- 2800 Block Perkins Lane West Retaining Wall and Water Main Replacement (May 7, 2024)
- Water Treatment Plant Clearwell and High Service Pump Replacement (May 7, 2024)
- MDOT 015- Dickinson (May 7, 2024)
- BRIDGE 3-24 (BRIDGE MAINTENANCE AND CONCRETE REPAIRS) (May 7, 2024)
- 10th Street Bridge Replacement Project (April 29, 2024)
- Trinity River Authority – DCRWS Treatment Plant Expansion to 16.5 MGD (April 29, 2024)
- RFB 5630 Project No. 21066 Yorktown Blvd. (Rodd Field Rd. to Oso Creek Bridge) Bond 2020 (April 25, 2024)
- LRRT Station and Tunnel Standpipe Replacement (April 22, 2024)
- East Lake Road Kraus Drive Sanitary Sewer Extension Project (April 22, 2024)
- Stillwater Lift Station and Force Main (April 22, 2024)
- Agrirama Lift Station Rehabilitation and Force Main (April 22, 2024)
- Construction of Marshfield Planning Expansions of I-44 Steel Casing Bore & Sewer Components (April 22, 2024)
- Wastewater Treatment Plant Raw Water Main Capacity Improvements (April 8, 2024)
- Texas Triangle Park Sanitary Sewer Project (April 8, 2024)
- Romero Camuesa & Arroyo Seco Retaining Wall (April 8, 2024)
- Swanson Pickle Lift Station and Force Main (April 8, 2024)
- Zurbrugg Waterfront Seawall Project (April 8, 2024)
- Gillets Creek Waterline Boring (April 8, 2024)
- CMAR Services-Governor Nicholls & Esplande Wharf Development (April 8, 2024)
- PFAS Water Treatment Plants (March 27, 2024)
- Bigelow Road Site New 2.16 MGD Water Treatment Plant Construction (March 27, 2024)
- Concourse B and Tunnel Design Services (March 27, 2024)
- Retaining Wall Rehabilitation (March 27, 2024)
- Write Farms Lift Station and Force Main Improvements (March 27, 2024)
- Facility One Pump Station and Force Main Improvements (March 27, 2024)
- Crooked Run and Double Tollgate Pump Station and Force Main (March 27, 2024)
- Albany Cox Creek Interceptor Sewer Project-Phase 3 (March 27, 2024)
- North Interceptor Wastewater Improvements Phase 1A (March 27, 2024)
- Stennis Space Center Wastewater Conveyance Construction (March 27, 2024)
- Raystown Dam Hydraulic Mechanical Gate and Bulkhead Replacement (March 27, 2024)
- I-44 Steel Casing Bore and Sewer Components Planning expansion (March 27, 2024)
- Wastewater Treatment System Upgrade (March 1, 2024)
- 2024 Wastewater System Improvements (March 1, 2024)
- Ludevine Pump Station (March 1, 2024)
- Casa Verde Lift Station Elimination and Sewer Reroute Project (March 1, 2024)
- Crabtree Interceptor Improvements (March 1, 2024)
- Wildcat Creek Force Main Relocation-Conveyance (March 1, 2024)
- SW Admiral Way/ Fairmount Ave North Bridge (March 1, 2024)
- Foundation Design and Trench Safety Plans for the Line Work-Water System Improvements (February 28, 2024)
- Water Line Upgrades (February 28, 2024)
- Design Basins-Whisper Way Storm Drainage Improvements Project (February 28, 2024)
- Leon Avenue Storm Sewer Outfall Replacement (February 28, 2024)
- 8” and 10” Sanitary Sewer Collection Mains and 160 Manholes Replacement (February 28, 2024)
- 2024 Sanitary Sewer Rehabilitation (February 28, 2024)
- 2022 Sanitary Sewer Line Replacement (February 28, 2024)
- Sunterra Lift Station (February 28, 2024)
- 1st Street Lift Station Upgrade (February 28, 2024)
- Bluff Street Interceptor Rehabilitation (February 28, 2024)
- RFP-Inland Bays Loop Project (February 28, 2024)
- Harvest Green WWTP Expansion to .95 MGD and Lift Station (February 28, 2024)
- Manvel Central Water Reclamation Facility (WRF) Expansion Project (February 28, 2024)
- Buechel Trunk Sewer Rehabilitation (February 28, 2024)
- Pump Station #4 Construction (February 28, 2024)
- Decatur Dry Creek WWTP Influent Pump Station and Headworks Improvements Prequalifying package (February 28, 2024)
- Qualifying Microtunnelling Contractors for Interceptor Sewer at Centreport South (February 28, 2024)
- Beck Branch Parallel Interceptor Phase II & Plano Spring Creek Force Main Parallel (February 28, 2024)
- Interbay Conveyance Rehabilitation and Odor Control (February 28, 2024)
- Bridge Culvert Replacement and Other Work (February 28, 2024)
- 300 West Waterline Replacement Project (January 17, 2024)
- SC252 Waterline Replacement Project (January 17, 2024)
- Historic Marine Way Seawall, Roadway and Drainage Improvement (January 16, 2024)
- NM MAT Whitetail Waterline Replacement Project (January 14, 2024)
- Supply and Installation of 2 Culverts (January 13, 2024)
- California Lift Station Improvements Project (January 13, 2024)
- Wastewater Collection System Lift Station Improvements (January 11, 2024)
- 2024 Sanitary Sewer Rehabilitation Project (January 11, 2024)
- Large Diameter Sanitary Sewer Rehabilitation (January 11, 2024)
- Crow Island Stormwater Storage and Conveyance Project (January 11, 2024)
- Regional Lift Station Expansion For Harris County MUD No. 422 (January 10, 2024)
- King Street Pump Station Improvements & H2Oaks ASR Lime System (January 10, 2024)
- North Bridgeland Lake Parkway Street Dedication (January 10, 2024)
- Lower Coddle Creek Parallel Interceptor Project (January 10, 2024)
- 1946 South Interceptor Sewer Repair Project (January 10, 2024)
- Harbor View Improvements and Culvert Replacement and Paving (January 8, 2024)
- Riverfront Conveyance Improvements (January 8, 2024)
- Bridge Deck Repair Project (January 5, 2024)
- 36-inch Water Transmission Main Booster Pump Station (January 3, 2024)
- Cantelow Road Bridge Project (January 3, 2024)
- Tunnel Effluent Pump Station-Ballard Conveyance (January 3, 2024)
- Morgan Creek Interceptor Replacement (January 2, 2024)
- Bridge Replacement with 27 in Box Beams and Approach Work (January 2, 2024)
- Northwest Missouri Design-Build Bridge Bundle (December 26, 2023)
- RFQ-Wastewater Engineering Services (December 20, 2023)
- Wastewater Treatment Plant Outfall Relocation Project (December 20, 2023)
- Raystown Dam Hydraulic Mechanical Gate and Bulkhead Replacements (December 20, 2023)
- Raystown Dam Hydraulic Mechanical Gate and Bulkhead Replacements (December 20, 2023)
- Crow Island Stormwater Storage and Conveyance (December 19, 2023)
- Murphy Creek Lift Station Improvements (December 19, 2023)
- East Side Storage Tank and Booster Pump Station (December 19, 2023)
- Concrete and Waterproofing Repairs (December 18, 2023)
- Wastewater Treatment Plant Improvements (December 18, 2023)
- Turkey Crossing Pump Station and Force Main (December 18, 2023)
- Linden Street Over Exeter River Bridge Repair (December 18, 2023)
- Wastewater Treatment Plant Influent Pump Station Replacement (December 17, 2023)
- Daybreak Public Onsite Sanitary Sewer Installation (December 17, 2023)
- Construction of New Reinforced Concrete Seawall and Revetment (December 17, 2023)
- Bridge Deck Repairs (December 17, 2023)
- Steel Bridge Beams for Yosemite National Park (December 17, 2023)
- Sanitary Sewer Rehabilitation (December 15, 2023)
- Dry Creek Interceptor Upsizing (December 14, 2023)
- Street Sanitary Sewer Improvements (December 13, 2023)
- Interbay Conveyance Rehabilitation and Odor Control (December 13, 2023)
- Escuminac Structures 409, 412, 503 Wharf Reconstruction (December 12, 2023)
- USDA Wastewater System Improvements (December 12, 2023)
- River Street Sanitary Sewer Construction (December 12, 2023)
- Regional Lift Station Expansion (December 12, 2023)
- Statewide Pedestrian Bridge (December 12, 2023)
- I-95 Bridge Rehabilitation (December 12, 2023)
- Roadwork-Supply and Installation of a Culvert (December 11, 2023)
- Fort Laramie Canal Tunnel 1&2 Rehabilitation (December 8, 2023)
- Jerome Library Tunnel Replacement (December 6, 2023)
- Oasis Creek Pump Station (December 6, 2023)
- RFP-Mason Creek Interceptor Replacement Project (December 5, 2023)
- 2023 Pelham Street Lift Station Upgrades (December 5, 2023)
- Depew Pumping Station Forcemain Replacement at Cayuga Creek (December 5, 2023)
- Midcoast Regional Airport Drainage Improvements (December 4, 2023)
- Winchester Bay Bore Project (December 4, 2023)
- Channel Conveyance Improvements (December 3, 2023)
- 2024 Wastewater Treatment Plant Improvements (December 2, 2023)
- Lanetta Lane Drainage Improvement Project (December 2, 2023)
- Chisaog Wastewater Treatment Plant Improvements (December 1, 2023)
- Pulpit Rock Drainage and Pathway Improvement (December 1, 2023)
- Montalvo and Riviera Pedestrian Bridge Coating Replacement (December 1, 2023)
- Grand Drive Lafayette Bridge Repairs (December 1, 2023)
- Old Ivy Sewer Rehabilitation Project (November 30, 2023)
- Gateway Park Pedestrian Bridge Replacement Project (November 30, 2023)
- Bid Southey Tunnel and Consolidation (November 29, 2023)
- Transporting and Deploying Bridge Tunnel Sections to the marked Cherrystone Reef Site (November 28, 2023)
- Transporting and Deploying Bridge Tunnel Sections (November 28, 2023)
- Heber Springs Wastewater Treatment Plant Improvements (November 27, 2023)
- City of Albert Lea, Wastewater Treatment Facility (November 27, 2023)
- City of Edgewater-Lift Station 11 Rehab (November 27, 2023)
- Gateway Grease Interceptor Replacement (November 27, 2023)
- Communications Tower Foundation Construction (November 27, 2023)
- Bridge Superstructure Replacement (November 27, 2023)
- Romance Master Meter, Pump Station and Water Main Construction (November 26, 2023)
- Lift Station 55 Rehabilitation (November 26, 2023)
- West Second Avenue Roadway and Drainage Improvements (November 26, 2023)
- Walnut Street Bridge Pedestrian/ADA Compliant Surface Deck (November 26, 2023)
- Massey and Smyly Wastewater Treatment Plant Grating and Handrail Replacement (November 25, 2023)
- Pump Station Upgrade (November 25, 2023)
- Millstone Pedestrian Bridge Construction (November 25, 2023)
- Douglas Road Drainage & Road Profile Improvements (November 24, 2023)
- Trout Run Interceptor CIPP Relining and Manhole Rehabilitation Project (November 23, 2023)
- Construction of Highway 41 Waterline and Crestview Sanitary Sewer Project (November 22, 2023)
- Sanitary Sewer and Manhole Rehabilitation Request for Bid RFB Project (November 22, 2023)
- Pool Bulkhead Replacement (November 22, 2023)
- Shoring and Structural Upgrades-Green Barn (November 21, 2023)
- Metropolitan Water Tunnel Program Final Design Services (November 21, 2023)
- Main St. Pump Station Interceptor Rehabilitation (November 21, 2023)
- 2023 Drainage Project (November 21, 2023)
- Edgeview Retaining Wall (November 20, 2023)
- Columbia County Sugar Creek Booster Pumping Station (November 20, 2023)
- Lake Ralph Hall-Raw Water Conveyance Program (November 20, 2023)
- 2022 Sewer Outfall Rehabilitation Project (November 18, 2023)
- CDBG-I Sewer Rehabilitation/Replacement (November 17, 2023)
- Honda Ridge Road Retaining Wall at Vandenberg Space Force Base (November 17, 2023)
- Crooked Creek Interceptor Phase 2 Improvements (November 17, 2023)
- Bangor Dry-dock 1 Spare Caisson (November 17, 2023)
- Bridge Replacement with 21-Inch Prestressed Concrete Box Beams & Guardrail on Burt Road over Pine Run Creek (November 17, 2023)
- Bridge Rehabilitation, Joints, Substructure & Steel Repairs, Partial Steel Paint & Concrete Beams Patching (November 17, 2023)
- Wastewater Inflow and Infiltration Grouting Project for the Town of Iva (November 16, 2023)
- Alexandra Park Phase 2A- Site 3 & 16-Shoring (November 16, 2023)
- Retaining Wall Restoration (November 16, 2023)
- Cyprus Shore Grading, Storm Drain, and Sewer Lift Station Improvements (November 14, 2023)
- Stewart Creek North Interceptor (November 14, 2023)
- Temporary Shoring Support for the Tractor Supply Pump Station (November 13, 2023)
- Ware State Prison Stormwater Management & Gymnasium Foundation Repair (November 13, 2023)
- Lock and Dam 25 Bulkhead Fabrication Contract (November 13, 2023)
- Goose Creek Road Water Line Relocation (November 12, 2023)
- Red River Region Timber Bridges Rehabilitation for Various Locations (November 11, 2023)
- RFP-Engineering Consultant Services Bridge Replacement, Bridge Removal and Other Works (November 11, 2023)
- Lakeside Sutter Pointe Sanitary Sewer Pump Station Improvement (November 10, 2023)
- Pump Station Rehabilitation (November 10, 2023)
- Foundation Repair and Stabilization of Homes (November 9, 2023)
- Burning Tree Water Line Replacement (November 8, 2023)
- Basin B Sanitary Sewer Rehabilitation Project (November 8, 2023)
- Ledges Golf Course Irrigation Pump Station Replacement (November 8, 2023)
- Elm Creek Sanitary Sewer Interceptor Rehabilitation (November 8, 2023)
- Grassy Creek Interceptors Rehabilitation (November 8, 2023)
- Sedge Island Bulkhead Replacement-Island Beach State Park (November 8, 2023)
- Wastewater Treatment Facility Improvement (November 7, 2023)
- RFP-Drumheller Michichi Creek Hwy 838 Bridge and Flood Wall Rehabilitation (November 7, 2023)
- Boring for Keowee-Toxaway State Park (November 7, 2023)
- Caisson Concrete Repairs (November 7, 2023)
- W. 46th St. Bridge over Cardinal Creek Replacement (November 7, 2023)
- Pump Station G Rehabilitation (November 7, 2023)
- Lift Station Rehabilitation (November 7, 2023)
- Dorchester Penitentiary-Tunnel Sewer System Replacement (November 7, 2023)
- Retrofit of Swinging Bridge Over Arroyo Grande Creek, Federal Project (November 6, 2023)
- Sanitary Sewer Service and Grinder Station Improvements (November 6, 2023)
- Foundation Repair, Bryan DHQ (November 6, 2023)
- Removal and Replacement of Rapid Infiltration Trench Repairs for Wastewater Treatment (November 3, 2023)
- Wastewater Plant Dewatered Sludge Transportation, Treatment Storage (November 3, 2023)
- Jack and Boring Services (November 3, 2023)
- Wolf Creek Interceptor Upsizing (November 2, 2023)
- Lansdowne Wastewater Treatment Centre Biosolids Program (November 2, 2023)
- Frenchman’s Creek Municipal Drain Construction (November 2, 2023)
- DFO Wharf and Launchway Reconstruction (November 1, 2023)
- Directional Boring and Sleeve Pipe Installation at Mule Creek State Prison (October 31, 2023)
- Bridge and Riverside Streets Rehabilitation (October 31, 2023)
- Design of New Structure on PR 201 over Main Drain (October 28, 2023)
- Precast Prestressed Concrete Girder Bridge Construction (October 26, 2023)
- Tunnel Repair Project (October 20, 2023)
- Little Whale Cove Bore (October 18, 2023)
- Bridge Improvements- Pearcy Road Bridge Repair (October 18, 2023)
- Wastewater Treatment Facility Improvements (October 18, 2023)
- Nose Creek Sanitary Sewer Trunk Phase B Contract 4 (October 18, 2023)
- Tunnel Pump Station Fit-Out Phase III (October 16, 2023)
- Southerly Tunnel and Consolidation Project (October 13, 2023)
- Grandstand Tunnel Installation (October 13, 2023)
Categories
Services
Featured
Locations
- Canada
- Other Countries
- United States
- D.C.
- North Dakota
- South Dakota
- Rhode Island
- Pennsylvania
- Oregon
- Oklahoma
- New Jersey
- New Hampshire
- Nebraska
- Montana
- Missouri
- Mississippi
- Minnesota
- Massachusetts
- Maine
- Kentucky
- Kansas
- Iowa
- Indiana
- Illinois
- Idaho
- Hawaii
- Georgia
- Florida
- Delaware
- Connecticut
- Colorado
- California
- Arizona
- Arkansas
- Alabama
- Alaska
- Wyoming
- West Virginia
- Wisconsin
- Vermont
- Virginia
- Washington
- Utah
- South Carolina
- North Carolina
- New Mexico
- Ohio
- Louisiana
- New York
- Nevada
- Maryland
- Michigan
- Tennessee
- Texas
- Travis County
- Dallas County
- Tarrant County
- Galveston County
- Fort Bend
- Bexar County
- Guadalupe
- Bastrop County
- Ellis County
- Harris County
- Kaufman County
- Collin County
- Guadalupe County
- Tyler
- Parker County
- Waller County
- Denton County
- Texas
- Corpus Christi
- Bryan
- Waco
- Leander
- Fort Bend County
- Brazoria County
- Plano
- Nassau Bay
- Zapata
- Lane City
- Friendswood
- Columbus
- Fort Worth
- McKinney
- Sugar Land
- Brazos County
- Buda
- Austin
- Port Aransas
- Athens
- Dallas
- Seabrook
- San Antonio
- Houston
Expertise
- Access Shaft Design
- Agency Approval Permitting
- Blasting Plans
- Bore Pit Design
- Bridge Jacking Services
- Bulkhead Design Services
- Bypass Pumping Plans
- Caisson Design Services
- Concrete Repair Services
- Construction Submittals Mastery
- Conveyance Engineering Solutions
- Demolition Plans
- Detention Pond Design
- Drainage Design
- Environmental Studies
- Flood Mitigation Services
- Foundation Design
- Geotechnical Design Services
- Interceptors Design by Stiver Engineering
- Lift Station Design
- Master Planning
- Pedestrian Bridges
- Precast Structures
- Pump Station Design
- Rescue Shafts & Shoring Recovery
- Retaining Wall Design
- Sanitary Sewer/Sanitary Sewer Lines Construction
- Seawall Design
- Sewer Rehabilitation
- Steel Tank Design
- Storm Drainage Analysis
- Storm Water/Storm Water Drainage
- Subdivision Planning
- Surveying
- Traffic Control Plans
- Trench Safety Design
- Tunnel Design
- Underground Structures
- Utility System Design
- Wastewater Treatment Plants
- Water Lines
- Wharf Design Services
Employment Opportunities
A career with Stiver Engineering offers professional growth and the opportunity to address ever-changing challenges head-on. This section is updated regularly with our available positions. Please e-mail your resume with a cover letter to careers@stivereng.com.
Current Opportunities
Posted 1/1/2022