Posted Date: April 8, 2024
Expiration Date: May 2, 2024
State: NY
Description: The design services scope of work consists of preparing bid documents to completely remove and replace the Steel Hose Standpipe System (SHSS) in the NFTA-Metro rail tunnel, which was part of the original construction. The total length of the SHSS is nine (9) miles in both directions (inbound & outbound) and is required by the NYS Building code. The SHSS is severely corroded throughout and is unable to maintain pressure as required by code.
Location: Niagara Frontier Transportation Authority, NY
Estimated Cost: $15,000,000