Posted Date: May 17, 2024
Expiration Date: June 10, 2024
State: TX
Description: Purpose of this project is to increase the capacity and flow of two (2) existing channels along with replacements of two (2) bridges. The project is located in the Sims Bayou Watershed (Precinct 1) within the corporate limits of the City of Houston (COH), near the confluence of Sims Bayou and Channel C147-00-00The scope of services for basic services is as follows: Reference Materials and Standards: • Harris County Flood Control District: o Criteria Manual for the Design of Flood Control and Drainage Facilities in Harris County o Policy and Design Criteria Manual for the Design of Flood Control and Drainage Facilities o Surveying Guidelines o HCFCD Drawing and Graphic Standards o Geotechnical Guidelines o Harris County Floodplain Reference Marks