State: CA
Description: 6 inches above finished grade. Temporary relocation of a 10-inch waterline is required utilizing a 10-inch PVC pipe with support over the creek. The bridge will be closed for approximately 3 months during spring construction, and no in-channel work will be allowed. Miscellaneous work consists of existing corrugated metal pipe cross culvert replacement, big block retaining wall, guardrails, metal tube railing, paving, and striping 6 inches above finished grade. Temporary relocation of a 10-inch waterline is required utilizing a 10-inch PVC pipe with support over the creek. The bridge will be closed for approximately 3 months during spring construction, and no in-channel work will be allowed. Miscellaneous work consists of existing corrugated metal pipe cross culvert replacement, big block retaining wall, guardrails, metal tube railing, paving, and striping.
Location: Solano County, CA
Estimated Cost: $1,550,000