BIDS & RPFs

We Get Things Done
You are here:
OPPORTUNITY

SW Admiral Way/ Fairmount Ave North Bridge

Location: Washington

Posted Date: March 1, 2024

Posted Date: February 20, 2024

Expiration Date: February 28, 2024

State: WA
Description: The seismic retrofit of the Admiral Way Bridges includes the following general items of work: strengthening of steel column bents, new bracing at concrete pier bents, retrofit of bridge deck joints, bridge abutment retrofit, slope stabilization, strengthening with Carbon Fiber Reinforced Polymer (CFRP), and steel painting.

Location: Seattle, WA

Estimated Cost: $6.9-7.3 Million