BIDS & RPFs

We Get Things Done
You are here:
Walnut Street Pedestrian Bridge Repair & Rehabilitation

Walnut Street Pedestrian Bridge Repair & Rehabilitation

Location: Chattanooga

Posted Date: July 29, 2024

State: TN 

Description: The total length of the bridge is approximately 2,370 feet, extending from Walnut Plaza at the south end to Frazier Avenue at the north end. The work to be done consists of repair of deficient structural steel elements; sandblasting and re-painting structural steel; replacement of existing electrical, lighting, and camera infrastructure; constructing a concrete platform to house the lighting controls which includes minor excavation; replacement of existing timber deck elements; implementation of pedestrian traffic control; and implementation of erosion prevention & sediment control measures.

Location: Chattanooga, TN