Stewart Creek North Interceptor

Stewart Creek North Interceptor

Location: Texas

Posted Date: November 14, 2023

Expiration Date: December 7, 2023

State: TX

Description: The project generally includes the construction of approximately 6390 linear feet of wastewater interceptor ranging from 8 inches to 15 inches in diameter. The proposed interceptor generally flows from False Pass Drive at Hutson Drive, west along Hutson Drive, then South along Preston Road, then west along Hickory Street, and ties into the existing wastewater system at Woodstream Drive south of Hickory Street. Approximately 980 linear feet shall be installed by other than open cut. The Project also includes the installation of approximately 28 new manhole.

Location: Frisco, TX