BIDS & RPFs

We Get Things Done
Port St. Joe Sewer Collection Transmission System Rehab Phase 2

Port St. Joe Sewer Collection Transmission System Rehab Phase 2

Location: Port St. Joe

Posted Date: July 8, 2024

State: FL 

Description: CDBG-DR SEWER COLLECTION TRANSMISSION SYSTEM REHABILITATION PHASE 2: LIFT STATION AND FORCEMAIN DESIGN. This project will consist of the construction of 4-inch and 6-inch sanitary force mains, sanitary sewer gravity lines, directional boring, lift station improvements, driveway/roadway improvements, and restoration activities to include seeding/sodding and landscape repair, as shown on the Construction Drawings 

Location: City of Port St. Joe, FL