BIDS & RPFs

We Get Things Done
You are here:
Gateway Park Pedestrian Bridge Replacement Project

Gateway Park Pedestrian Bridge Replacement Project

Location: California

Posted Date: November 30, 2023

Expiration Date: January 9, 2024

State: CA

Description: The City of San Mateo (City) is soliciting written proposals from qualified firms to provide engineering design services for the Gateway Park Pedestrian Bridge Replacement Project (hereinafter referred to as “Project”). The pedestrian bridge spans over San Mateo Creek from Gateway Park to the corner of 2nd Avenue and South Grant Street. The bridge is located within the City of San Mateo and is approximately 0.3 miles west of Highway 101 and approximately 0.7 miles east of the Highway 82 (El Camino Real)

Location: San Mateo, CA