North Clarksville Water Treatment Plant

We Get Things Done
North Clarksville Water Treatment Plant

North Clarksville Water Treatment Plant

Stiver Engineering designed key components for the 452 feet pump station tunnel at the North Clarksville Water Treatment Plant in Clarksville, Tennessee. Designs included an 87.5-inch diameter casing, thrust block and analysis for the anticipated pipe jacking loads for the tunnel. Pipe buoyancy calculations were performed along with the CMU bulkhead design and analysis for the grouting of the annulus space between the carrier pipe and the tunnel.

The pump station tunnel was built to install the intake pipes. As a result, the tunnel drive ended under water where a wet retrieval of the TBM was required. Stiver Engineering provided several different steel bulkhead designs and a step-by-step wet retrieval methodology for all tunnel construction phases and TBM recovery.