BIDS & RPFs

We Get Things Done
You are here:

services

expertise

Transporting And Deploying Bridge Tunnel Sections

Transporting and Deploying Bridge Tunnel Sections

Location: Virginia

Posted Date: November 28, 2023

Expiration Date: December 12, 2023

State: VA

Description: The project will consist of placement of approximately 100 miscast bridge tunnel sections at Cherrystone Reef located approximately 1.85 miles from the mouth of Cherrystone Creek. The contractor will be responsible for transporting and deploying reef structures to the marked site. All materials are to be available for inspection prior to and during loading (by VMRC staff). Structures not deemed suitable by the VMRC staff will not be deployed and must be taken back to the loading point by the contractor.

Location: Virginia Marine Resources Commission