The contract documents for this project, located in Houston, Texas, specified that an 84-inch diameter siphon needed to be installed beneath Buffalo Bayou at a depth of 112 feet below ground surface.
Stiver Engineering provided construction engineering by designing two access shafts for the project, which were designed using 24-inch secant piles in combination with ring beams.