As part of work on three new Highway 105 bridges that cross rivers between Brenham and Navasota, Texas, Stiver Engineering provided a sheet pile and tie rod shoring system design for the installation of the bridges’ bent foundation and abutment. The shoring plan included temporary wale sets, as well as a staging plan for accessing and excavating to the required depth to install the bent foundation and abutment. The final stage of work was a permanent sheet pile structure around the bent that was filled with low density concrete.
Get Started Today!
Stiver Engineering Commitment
“We are driven by a passion for getting the job done. Every challenge presents an opportunity for innovation, and we embrace those challenges by engineering unique solutions that ensure our clients’ success.”
– JOHN STIVER
"*" indicates required fields
Or Call Us At
713-526-3478