BIDS & RPFs

We Get Things Done
You are here:
Retaining Wall Rehabilitation

Retaining Wall Rehabilitation

Location: Ontario

Posted Date: March 27, 2024

Posted Date: March 26, 2024

Expiration Date: April 17, 2024

Province: ON

Description: The Contract is generally for the rehabilitation of existing retaining walls at Spruce St, Columbia St, and Richmond St. Spruce St retaining wall rehabilitation involves EITHER installing soil nails through the existing retaining wall and installing new concrete fascia and drainage systems OR installing driven pipe pile in front of the existing retaining wall with new concrete fascia. Columbia St retaining wall rehabilitation involves removing existing stacked block retaining wall elements and installing soldier piles and concrete lagging panels. Additional work includes removing and replacing chainlink fence segments in-kind and installing a berm to divert water to the road instead down the face of the retaining wall.Richmond St retaining wall rehabilitation involves the use of installing soil nails through existing retaining walls and installing new concrete fascia and drainage systems. Richmond St rehabilitation is a provisional item within the Contract.

Location: New Westminster, ON