BIDS & RPFs

We Get Things Done
You are here:
Auto Draft

Retaining Wall Reconstruction at Quarter Town Line

Location: Tillsonburg

Posted Date: June 12, 2024

Posted Date: May 29, 2024

Expiration Date: June 18, 2024

State: ON

Description: Retaining Wall Reconstruction along Quarter Town Line – This tender contains the construction of retaining wall located on the west side of Quarter Town Line, above a twin cell concrete culvert. The proposed retaining walls are to be reconstructed with prefabricated retaining wall cells from Terrafix or approved equivalent with geogrid reinforcement, as well as installing new concrete curb and gutter, concrete sidewalk, granular materials, asphalt resurfacing, and boulevard and driveway restoration.