Stiver Engineering provided the horizontal directional drilling alignment and pulling calculations for a 42’’ inch diameter force main crossing beneath the Houston Ship Channel adjacent to the 69th street wastewater treatment plant. The purpose of the HDD installation was to replace the existing Hedrick Force Main Aerial Crossing. The HDD was approximately 1,000 ft. and was installed to a depth of 100 ft.
Get Started Today!
Stiver Engineering Commitment
“We are driven by a passion for getting the job done. Every challenge presents an opportunity for innovation, and we embrace those challenges by engineering unique solutions that ensure our clients’ success.”
– JOHN STIVER
"*" indicates required fields
Or Call Us At
713-526-3478