One of our clients had to install a force main on piles at a depth of 12-feet below Charleston Bay. The project is located on the South side of Plum Island in the Ashley River Basin in Charleston, South Carolina. Stiver Engineering was retained to provide construction engineering services to design a shoring system for the installation of the force main that would allow the contractor access to the site during low tide conditions. The shoring was designed with sheet piles, wales, and cross struts, enabling the contractor to drive an excavator and front-end loader on the wale set for access to the excavation and installation of the force main. The force main now connects the new lift station to the existing Plum Island wastewater treatment facility.
Get Started Today!
Stiver Engineering Commitment
“We are driven by a passion for getting the job done. Every challenge presents an opportunity for innovation, and we embrace those challenges by engineering unique solutions that ensure our clients’ success.”
– JOHN STIVER
"*" indicates required fields
Or Call Us At
713-526-3478