State: VT
Description: including the removal of existing retaining walls, removal of existing bridge abutments, shoring of existing retaining wall to remain, installation of new retaining walls segment, installation of new bridge abutments, installation of new pedestrian bridge, reconnecting utilities, minor grading within river corridor to expand floodway volume capacity, installation of riprap, slope stabilization measures and planting, and paving and landscape improvements to pedestrian bridge access..
Location: Hardwick, VT