Parmer Lane Wastewater Tunnel Interceptor

We Get Things Done
project image

Parmer Lane Wastewater Tunnel Interceptor

Stiver Engineering performed analysis and design work for rock anchors and HSS steel frames for a 44.5-inch diameter pipe support inside a 96-inch diameter tunnel. The supports were designed for critical load combinations generated from buoyant forces and self-weight of the pipe.