As part of the Brazos Street Bridge demolition in Houston, Texas, Stiver Engineering provided a demolition staging plan for the bridge concrete decking that would be replaced. We also developed a bridge beam shoring system and a plan to jack up the steel bridge beams to replace existing bearing pads at all bents and the abutments.