State: DE
Description: The improvements consist of furnishing all labor and materials to remove the existing sidewalks on the bridge and mill the concrete deck, construct the existing bridge deck overlay, stamp and color the concrete bridge deck, reconstruct the existing sidewalk on the bridge approaches to tie into existing sidewalks, mill and overlay the roadway approaches, install roadway striping and ADA improvements, and install new signage. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer.
Location: Milford, DE