This project specified the construction of two reinforced concrete boxes from Buffalo Bayou to San Felipe Road in Houston, Texas. The excavation was located a short distance from high-voltage power line towers and two main railroad lines. Stiver Engineering was hired to provide construction engineering through a braced shoring system that included sheet piles, wales, and a cross strut design that could be adjusted to accommodate construction.
WE GET THINGS DONE
