State: NJ
Description: The project scope includes site clearing, the construction of an 1,100-linear foot hot mix asphalt trail, installation of a 50-foot prefabricated pedestrian truss bridge and foundations, extension of an existing 30” storm sewer outfall pipe, site restoration, and associated work. The project area is accessible via the Remembrance Road entrance to Michael J. Tighe Park from Georgia Road. The proposed improvements are situated east of the existing easternmost softball fields and will extend across a tributary branch of the Manasquan River to an existing asphalt path located along Polo Club Drive.
Location: NJ