Posted Date: April 17, 2024
Expiration Date: May 8, 2024
State: TX
Description: This Project includes the reconstruction of approximately 7,900 LF of Yorktown Boulevard from Rodd Field Road to Oso Creek Bridge with new HMAC (Base Bid 1) or Concrete (Base Bid 2) pavement and new curb, median, and concrete sidewalk/ shared use path. Also included are improvements and upgrades to the Storm Water, Water, Wastewater, Gas, Lighting Infrastructure, and Traffic Signals. Bidders may submit bids on either Base Bid 1 or Base Bid 2 or both.
Location: Corpus Christi, TX
Estimated Cost: HMAC: $27,300,000.00 CONCRETE: $26,990,000.00