BIDS & RPFs

We Get Things Done
You are here:
Wastewater Treatment Plant Raw Water Main Capacity Improvements

Wastewater Treatment Plant Raw Water Main Capacity Improvements

Location: Florida

Posted Date: April 8, 2024

Posted Date: March 31, 2024

Expiration Date: May 2, 2024

State: FL

Description: The City of Miramar is seeking a Contractor to complete the following capacity improvements services to the West Water Treatment Plant Raw Water Main, to include, but not limited to; all necessary labor, materials, machinery, tools, equipment, installation and incidentals to open cut installation of 791 LF of 16” DIP, 992 LF of 18” DIP, and 685 LF of 24” DIP raw water main, multiple horizontal directional drillings with a total of 1,711 LF of 18” HDPE and a total of 4,930 LF of 20” HDPE raw water main, and the installation of a 16” DIP canal aerial crossing, and a concrete master vault for connection at the West Water Treatment Plant, and in accordance with all Contract Documents.

Location: Miramar, FL