Posted Date: February 19, 2024
Expiration Date: March 19, 2024
State: OR
Description: the construction of a fully functional wastewater treatment system. The scope includes an influent flowmeter and screening, lift station, treatment and storage lagoons, chlorination building and system, effluent pump station, irrigation pump station, approximately 7-acre center pivot irrigation system, and all other Work required for a complete and functional wastewater treatment system as shown on the Drawings and specified in the Technical Specifications.
Location: Dufur, OR