BIDS & RPFs

We Get Things Done
You are here:
Crooked Run And Double Tollgate Pump Station And Force Main

Crooked Run and Double Tollgate Pump Station and Force Main

Location: Virginia

Posted Date: March 27, 2024

Posted Date: March 19, 2024

Expiration Date: April 23, 2024

State: VA

Description: Work includes converting an existing sludge holding basin into a pump station wetwell, providing a suction lift pump station in a pre-cast concrete building with supporting electrical, mechanical and control work. Work includes providing multiple vaults and buried utility relocations for force mains, flow meters and comminutors at the Crooked Run Wastewater Treatment Plant Site. Work includes abandoning and decommissioning the existing Crooked Run Wastewater Treatment Plant. Work includes providing approximately 35,600 linear feet of 10-inch and 12-inch force mainincluding multiple bore and jack and direction drill road crossings.Double Tollgate Pump Station and Force Main: Construct a new pump station and force main to serve the Double Tollgate region of Clarke County. Work includes providing a suction lift pump station in a pre-cast concrete building with supporting electrical, mechanical andcontrol work. Work includes providing a flow meter and comminutor at the Double Tollgate Pump Station Site. Work includes providing approximately 2,400 linear feet of 6-inch force main including a bore and jack road crossing.

Location: Frederick County, VA