Wastewater Treatment Plant Outfall Relocation Project

Wastewater Treatment Plant Outfall Relocation Project

State: WA Description: Significant project elements include: Construction of a 48-inch diameter WWTP outfall from the WWTP to the end of U Avenue; blasting and excavating rock for several hundred feet of the pipeline alignment at depths up to approximately 30 feet deep; manhole structures’ selective demolition of existing piping and structures including asbestos concrete…

Murphy Creek Lift Station Improvements

Murphy Creek Lift Station Improvements

State: CO Description: Initially, Operations notified Engineering the roof at Murphy Creek needed replacement and the site has seen settlement which has resulted in electrical conduits potentially breaking, dooring needing to be shimmed or trimmed so they would close, and large gaps at joints. Upon further investigation and discussion, additional maintenance issues were identified, including…

Wastewater Treatment Plant Improvements

Wastewater Treatment Plant Improvements

State: TN Description: The work involved is in one (1) contract and consists of the following generally described work: CONTRACT 23-01 – WASTEWATER TREATMENT PLANT IMPROVEMENTS – • Site Excavation and Piping • New Headworks with fine screening and grit removal • Two (2) New Sequencing Batch Reactor Basins • New Chlorine Contact / Effluent…

Turkey Crossing Pump Station And Force Main

Turkey Crossing Pump Station and Force Main

State: GA Description: The project involves construction of a pump station and force main to serve as the initial phase of the Turkey Crossing Pump Station. The work consists of mobilization and demobilization, site clearing, site staking, excavation and grading, rock blasting and removal, backfill of excavated areas, extension of gravity sewer to the proposed…