Stewart Creek North Interceptor

Stewart Creek North Interceptor

State: TX Description: The project generally includes the construction of approximately 6390 linear feet of wastewater interceptor ranging from 8 inches to 15 inches in diameter. The proposed interceptor generally flows from False Pass Drive at Hutson Drive, west along Hutson Drive, then South along Preston Road, then west along Hickory Street, and ties into…

Ware State Prison Stormwater Management & Gymnasium Foundation Repair

Ware State Prison Stormwater Management & Gymnasium Foundation Repair

State: GA Description: This project will include stormwater master planning, hydraulic analysis and inspection of existing structures, design for improvements to the drainage system for the entire facility and building foundation and storm drainage repairs at the Inmate Gymnasium Building. Services will include structural design, hydraulic analysis and design, construction materials testing, and construction observation during repairs.…

Goose Creek Road Water Line Relocation

Goose Creek Road Water Line Relocation

State: AR Description: The Project consists of the installation of approximately 930 LF of 14” HDPE water line by horizontal directional drilling under the Illinois River and adjacent wetlands, 130 LF of 12” ductile iron water line, and cut-in connections to an existing 12” water line on the north side of Goose Creek Road in Washington County Location: Washington County, AR