Ledges Golf Course Irrigation Pump Station Replacement

Ledges Golf Course Irrigation Pump Station Replacement

State: MA Description: To provide a single source responsibility for the manufacture, warranty, service and operation of a prefabricated, skid mounted, fully automatic variable speed pumping system (systems) for turf irrigation. The pumping system shall automatically maintain a constant discharge pressure regardless of varying flow demands within the station rating. The pumping system shall conform…

Grassy Creek Interceptors Rehabilitation

Grassy Creek Interceptors Rehabilitation

State: OH Description: The project consists of cleaning and televising approximately 8,465 LF of existing sewers, testing and grouting sewer pipe joints and laterals, lateral point repairs, installation of approximately 8,465 LF of cured-in-place liners, post construction inspection and televising approximately 8,465 LF of sewers and other incidentals. Location: Perrysburg, OH

Wastewater Treatment Facility Improvement

Wastewater Treatment Facility Improvement

State: IA Description: Construct Wastewater Treatment Facility Improvements including all materials, labor and equipment necessary for excavation, backfill and sitework; concrete, seal coat and granular surfacing; fencing; reinforced concrete; precast concrete; masonry; metal building system; interior building work including plumbing, heating, ventilating and associated work; doors; painting; gates; mechanically-cleaned bar screen; vertical turbine solids handling pumps; grit removal and…