Interbay Conveyance Rehabilitation and Odor Control
State: WA Description: Work generally includes installation of a temporary bypass pipe from the pump station to the north end of the project; replacement of the twin 36-inch diameter steel forcemains with 42-inch ductile iron pipe; construction of an odor control facility (OCF) and access road at the forcemain discharge structure (FMDS); and rehabilitation of…