Write Farms Lift Station And Force Main Improvements

Write Farms Lift Station and Force Main Improvements

Posted Date: March 18, 2024 Expiration Date: April 3, 2024 State: TX Description: The major work will consist of installing a fully operational 1,955 gallons per minute (gpm) firm pumping capacity triplex pump lift station, and approximately 9,720 linear feet (LF) of 12 C900 DR-25 PVC force main. The above Improvements are a part of…

Facility One Pump Station And Force Main Improvements

Facility One Pump Station and Force Main Improvements

Posted Date: March 14, 2024 Expiration Date: April 10, 2024 State: OH Description: The work consists of the following: installation of approximately 1732 feet of 6” force main, 42 feet of 14” steel encasement pipe (bored), 1 air release manhole, 1 force main valve vault, 1 manhole, 40 feet of 6” gravity sewer, 40 feet…

Crooked Run And Double Tollgate Pump Station And Force Main

Crooked Run and Double Tollgate Pump Station and Force Main

Posted Date: March 19, 2024 Expiration Date: April 23, 2024 State: VA Description: Work includes converting an existing sludge holding basin into a pump station wetwell, providing a suction lift pump station in a pre-cast concrete building with supporting electrical, mechanical and control work. Work includes providing multiple vaults and buried utility relocations for force…

Albany Cox Creek Interceptor Sewer Project-phase 3

Albany Cox Creek Interceptor Sewer Project-Phase 3

Posted Date: March 11, 2024 Expiration Date: March 26, 2024 State: OR Description: This project includes open trench installation of approximately 2,250 linear feet of 24-inch sanitary sewer main at an average depth of approximately 20 feet; approximately 326 linear feet of 36-inch diameter steel casing with a 24-inch diameter carrier pipe installed via jack-and-bore…

North Interceptor Wastewater Improvements Phase 1a

North Interceptor Wastewater Improvements Phase 1A

Posted Date: March 13, 2024 Expiration Date: March 27, 2024 State: TX Description: The project generally consists of but is not limited to all labor, materials, equipment, appurtenances and incidentals as required to properly install, complete and be accepted in place approximately 570 linear feet of 30-inch & 36-inch Hobas ASTM D3262 gravity wastewater line,…