Sh 288 Reconstruction Project - Southmore Bridge Demolition

SH 288 Reconstruction Project – Southmore Bridge Demolition

The SH 288 Reconstruction Project includes improvements that encompass a 10.3-mile stretch from US 59 to the Harris County line at Clear Creek and involves the expansion of three major interchanges: Beltway 8, which will include (8) new direct connector/ramp bridges. Loop 610, which will include (8) new direct connector/ramp bridges. The Texas Medical Center,…

Northeast Water Purification Plant Expansion Project

Northeast Water Purification Plant Expansion Project

The City of Houston’s Northeast Water Purification Plant (NEWPP) Expansion Project is a design-build project that will add 320 million gallons per day (mgd) by 2024 to the existing water plant’s capacity. The expansion project will allow the City and the regional water authorities to meet projected demands, while fulfilling requirements set by the Harris-Galveston…

Druid Lake Excavation & Shoring Project

Druid Lake Excavation & Shoring Project

To help secure the Baltimore, Maryland City’s water supply, the Baltimore City Department of Public Works is covering a considerable portion of Druid Lake and installing two large underground water tanks.  Druid Lake holds filtered and treated water that is ready to be sent to consumers. To protect this drinking water supply, two covered storage…

Lake Hartwell Water Treatment Plant - Raw Water Pump Station

Lake Hartwell Water Treatment Plant – Raw Water Pump Station

Division 1 of this Project consists of, but is not limited to, the following: raw water pump station including passive intake screen, intake line, wetwell, two (2) vertical turbine pumps and space for a third pump, bridge crane, and potassium permanganate feed system; cast-in-place concrete 2.5 MGD pretreatment facilities including two-stage rapid mix, two-stage flocculation,…