Excavation Plans
Stiver Engineering provides clients with construction engineering through excavation plans throughout the country. These plans are designed per OSHA Regulations: 29 CFR 1926, Subpart P – Excavation, Trenching, and Shoring…
Stiver Engineering provides clients with construction engineering through excavation plans throughout the country. These plans are designed per OSHA Regulations: 29 CFR 1926, Subpart P – Excavation, Trenching, and Shoring…
The Waterloo Park project, Austin, Texas, specified that the flood waters stretching from Waterloo Park to Lady Bird Lake be diverted 70 feet below ground through a concrete shaft and…
A client requested construction engineering assistance in the installation of supply and return piping beneath Memorial Circle on Texas Tech University’s campus in Lubbock, Texas. Stiver Engineering designed a shoring…
This project, located in Houston, Texas, specified that the existing high voltage lines running parallel to Interstate 10 be installed in a duct bank at a depth of 32 feet…
A new pump station was being constructed in Houston, Texas to facilitate the widening of Interstate 10 on the west side of Downtown Houston; the existing site was on the…