Bois D’Arc East Fork Trinity River Tunnel
This $12.4 million project for the North Texas Municipal Water District involves 2,534 linear feet of 118-inch excavated diameter tunneling. The tunnel will consist of 4-flange liner plate and will…
This $12.4 million project for the North Texas Municipal Water District involves 2,534 linear feet of 118-inch excavated diameter tunneling. The tunnel will consist of 4-flange liner plate and will…
The Integrated Pipeline is a $48.5 million joint water supply project between Dallas Water Utilities and Tarrant Regional Water District. It involves building 150 miles of pipeline to transport up…
The Mill Creek Drainage Relief Tunnel is a construction project that will bring needed infrastructure improvement to east Dallas, Texas. It will include 26,385 linear feet of tunneling at a…
The new TxDOT bridge will replace the existing truss bridge over the Colorado River in Columbus, Texas. Stiver Engineering provided construction engineering to the bridge contractor with cofferdam designs for…
The SH 288 Reconstruction Project includes improvements that encompass a 10.3-mile stretch from US 59 to the Harris County line at Clear Creek and involves the expansion of three major…