Paradise Whitney Interceptor
The sewer system in the city of Las Vegas was disjointed and inefficient. Connections to the main sewer line were sporadic, and relief sewers could not adequately intercept flow. To…
The sewer system in the city of Las Vegas was disjointed and inefficient. Connections to the main sewer line were sporadic, and relief sewers could not adequately intercept flow. To…
As a part of Memphis’ North Mud Island Interceptor Sewers Project, Stiver Engineering was retained to provide a shoring design for sliplining an existing 120” diameter RCP sewer line with…
The City of Houston has spearheaded the Northgate Regional Lift Station project as part of its plan to reduce operational and maintenance costs by consolidating 39 wastewater treatment plants and…
As part of a 108-inch transmission waterline project along Esplanade Boulevard between Imperial Valley Drive and Green Plaza in Houston, Stiver Engineering provided a custom lifting plan for the bottom…
Stiver Engineering provided key design services for the Northeast Transmission Line (NETL) project in Houston. The NETL will transmit 365 million gallons of water a day from the Northeast Water…