Stiver Engineering performed a bridge analysis, pedestrian bridge lifting and placement plans for the new North Post Oak pedestrian bridge. A load analysis was also conducted on an adjacent existing bridge. Our team ensured stability, as well as load capacity and compliance with engineering standards. We designed lift staging plans for safe and efficient installation while enhancing pedestrian connectivity and supporting Houston’s commitment to improved urban mobility.
Learn more about this project at: https://houston.culturemap.com/news/city-life/how-to-pay-respects-as-late-houston-mayor-sylvester-turner-lies-in-state/