Stiver Engineering provided the structural design of the 34 ft. ID x 80 ft. deep secant pile launch shaft and secant pile receiving shafts for the 132in. diameter tunnel beneath US 59.
Get Started Today!
Stiver Engineering Commitment
“We are driven by a passion for getting the job done. Every challenge presents an opportunity for innovation, and we embrace those challenges by engineering unique solutions that ensure our clients’ success.”
– JOHN STIVER
"*" indicates required fields
Or Call Us At
713-526-3478