As part of infrastructure improvements to the US 290 WBML at the SH 6 overpass in Waller County, Stiver Engineering Inc. designed a bridge jacking system to facilitate the replacement of bearing pads at Abutment 4. This critical upgrade involved careful structural planning and system design to ensure safety during lifting operations and long-term performance of the bridge. Our approach emphasized durability, constructability, and minimal disruption to traffic flow on this vital corridor. The project supports continued mobility across a key transportation route and aligns with our commitment to delivering resilient, high-quality infrastructure

Get Started Today!
Stiver Engineering Commitment
“We are driven by a passion for getting the job done. Every challenge presents an opportunity for innovation, and we embrace those challenges by engineering unique solutions that ensure our clients’ success.”
– JOHN STIVER
"*" indicates required fields
Or Call Us At
713-526-3478