FM 359 NB Ponds Creek Bridge-Beam Modifications

Stiver Engineering Inc. provided the bridge jacking design for the FM 359 Northbound Ponds Creek Bridge to facilitate the safe and efficient replacement of bearing pads. The project involved a detailed structural analysis and a carefully engineered jacking system to ensure stability during lifting and long-term performance of the bridge structure. Our design approach focused on safety, durability, and minimizing disruption to ongoing traffic operations. This work supports the continued reliability of the bridge and demonstrates our commitment to delivering practical, resilient infrastructure solutions.