Communications Tower Foundation Construction

Posted Date: November 27, 2023 Expiration Date: December 8, 2023 State: MA Description: Project consists of constructing a tower foundation, erecting an existing, city-owned self-supporting tower, removing existing radio equipment from an adjacent pole location and mounting equipment onto the newly constructed tower and related Work per the bid specifications, including all labor, materials and…

Foundation Repair, Bryan DHQ

Posted Date: November 6, 2023 Expiration Date: January 2, 2024 State: TX Description: This project includes the proposed foundation stabilization of the Bryan District headquarters Administration Office Building. Installation of helical piers along approximately half the building perimeter to lift the building and limit future settlement. Polyurethane injection to fill any existing voids under the…

Foundation Repair and Stabilization of Homes

Posted Date: November 9, 2023 Expiration Date: December 1, 2023 State: TX Description: Opportunity Home San Antonio, formerly known as the San Antonio Housing Authority and its affiliated entities, hereby invites qualified independent Contractors to submit bids for inspection, evaluation, repair, and/or stabilization of the foundation for sixteen (16) units at Monterrey Park located at…

Ware State Prison Stormwater Management & Gymnasium Foundation Repair

Posted Date: November 13, 2023 Expiration Date: December 14, 2023 State: GA Description: This project will include stormwater master planning, hydraulic analysis and inspection of existing structures, design for improvements to the drainage system for the entire facility and building foundation and storm drainage repairs at the Inmate Gymnasium Building. Services will include structural design, hydraulic analysis…

Plum Creek HDD Project

Stiver Engineering provided the contractor with an alternate tunneling method for a 6-inch diameter force main.  The alternate design consisted of a horizontal directional drill (HDD) that was 21 ft. beneath an existing railroad.  The pull forces and pipe stresses were analyzed and a profile was delivered to the contractor for construction.