BIDS & RPFs

We Get Things Done
You are here:
Water treatment plant construction Project

Water Treatment Plant Construction Project

Location: Massachusetts

Posted Date: March 25, 2025

Expiration Date: April 9, 2025

Source: BidPrime

Posted Date: March 5, 2025

Expiration Date: April 9, 2025

State: MA

Description: The Work of this Contract generally consists of the construction of a 2.0 million gallon per day (mgd) water treatment plant (WTP) for the existing surface water supply. The WTP will utilize magnetic ion-exchange (MIEX) treatment, Greensand Plus filtration, PFAS contactors, disinfection, chemical feed systems, pumps, and appurtenances. Building components including HVAC, plumbing, fire sprinkler system, and electrical equipment shall be incorporated into the new WTP. Additional work will include the site work, utilities installation, below-grade concrete tanks and foundation, masonry building, and finishes. Additive Alternate A includes demolition of the existing chemical feed facility and existing chlorine contact tank, and removal of equipment and concrete pads inside the existing pump station.

Estimated Cost:

Contact: Rich Zini Rzini@doc.buil (413) 534-5667

Location: Attleboro, MA