State: MO
Description: The project office requires a new wastewater treatment system for the Powerhouse and Maintenance facility. The new system will utilize portions of the existing sewer pipe, will add new septic tanks, and will require a new leach field to be constructed. In addition, the existing comfort station will be demolished and some utilities will be removed and/or abandoned. A new sewer line, septic tanks, lift station and leach field will be installed for the new comfort station, as well as utilities for a pre-cast concrete replacement comfort station and the installation of an aggregate pad. The existing lagoon will be removed and graded to a level usable surface.
Location: Warsaw, MO