State: NY
Description: The work includes the installation of approximately 160 linear feet of soldier pile and lagging wall, 40 linear feet of Mechanically Stabilized Earth System (MSES) wall at two separate locations, a sidewalk with bridge railing atop a moment slab, sidewalk at-grade, curbs, and roadway signage and striping.
Location: Rye, NY