State: TX
Description: The work consists of providing the necessary labor, materials, equipment, and supervision to construct Regional Lift Station Expansion including but not limited to demolition of above ground riser piping and valves; demolition of a portion of the existing header piping; demolition of all wet well piping and fittings; demolition of all pump guide rails and intermediate supports; demolition of existing pumps; installation of proposed above ground riser piping, valves, and pipe supports; installation of proposed portion of header piping and valves; installation of wet well piping; installation of proposed pumps including guide rails, intermediate supports, and accessories; blast and recoat of all existing above ground piping; riser support cleaning and modifications; odor control pump modifications; odor control system modifications; demolition of existing submersible cable; installation of submersible pump cables and fixed capacitors for each proposed pump; site restoration; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station.
Location: Houston, TX