Description The Owner is seeking to engage a general contractor to complete the Pritchard Water Treatment

Plant Project. The completion of the following work is expected (approximate quantities):

  • New water treatment building, including doors, foundations, and concrete clearwell;
  • Installation of vendor-supplied ultra-filtration equipment (UF skids, feed tanks, clean-inplace system, ancillary and support equipment);
  • 2 new submersible intake pumps;
  • 2 treated water distribution pumps, piping, and appurtenances;
  • Sodium hypochlorite dosing system;
  • 370m of new 150mm diameter watermain, tie-ins to the TNRD’s existing system, and appurtenances;
  • External backwash water pump station and forcemain to the wastewater treatment plant;
  • Miscellaneous process piping, instruments and controls, and ancillary items;
  • Related HVAC equipment;
  • Related electrical equipment, controls, and instrumentation;
  • Gravel access driveway, site grading, shallow storm infrastructure, and ditching;
  • All others items as shown on the attached Drawings.