Posted Date: March 14, 2024
Expiration Date: April 23, 2024
State: MA
Description: The work consists of construction of a new 2.14 MGD PFAS Water Treatment Plant at the John P. Lynn site in a 9,900 s.f. pre-engineered metal building. The work also consists of construction of a new 1.22 MGD PFAS WTP at the Lake Nip site in a 3,000 s.f. pre-engineered metal building. The work also includes demolition of equipment in the existing aeration building at the John P. Lynn site and the existing GAC treatment building at the Lake Nip site. The project shall be completed within 840 calendar days of the Notice to Proceed. Construction is expected to begin in the Summer of 2024.
Location: Raynham Center Water District, MA
Estimated Cost: $25,000,000