North Interceptor Wastewater Improvements Phase 1A

Location: Mississippi

Posted Date: March 27, 2024

Posted Date: March 13, 2024

Expiration Date: March 27, 2024

State: TX

Description: The project generally consists of but is not limited to all labor, materials, equipment, appurtenances and incidentals as required to properly install, complete and be accepted in place approximately 570 linear feet of 30-inch & 36-inch Hobas ASTM D3262 gravity wastewater line, 3 new manholes, approximately 390 linear feet of bore and encased line using 54-inch steel casing pipe for highway crossing, temporary by-pass system, abandonment of approximately 450 linear feet of existing 27- inch gravity wastewater lines, road repair and all necessary components as shown on the project drawings and as specified herein.