State: UT
Description: Final Design to be completed by end of 2024 with Construction beginning in 2025. Will replace an existing 30 MGD Lift Station with a 83 MGD Pump Station. Engineer: Bowen Collins
Location: Utah County, UT
State: UT
Description: Final Design to be completed by end of 2024 with Construction beginning in 2025. Will replace an existing 30 MGD Lift Station with a 83 MGD Pump Station. Engineer: Bowen Collins
Location: Utah County, UT