State: OR
Description: Contractor will furnish labor and equipment to bore approximately 5,890 lineal feet of 1-2″ HDPE conduit located at Little Whale Cove in Depoe Bay, Oregon. Contractor may also be required to install elbows, to Central Lincoln specifications. Some locations will require coordination with CLPUD crews to install sweeps into energized equipment. All material will be supplied by Central Lincoln.
Location: Depoe Bay, OR